A periodic review is a recurring, scheduled check of a controlled document, such as an SOP or work instruction, to confirm it still matches how the work is done. The procedure owner compares the document with the real task, then records one of three outcomes: still correct, needs a new version, or no longer needed. Periodic review catches the changes nobody asked for, such as a workaround that became the real method. The interval is usually set by risk, often 12 months for high-risk procedures and 24 months for the rest, and some regulations set their own cycle.
Key characteristics
- Scheduled: each procedure has a next review date, set by risk or by a rule
- Owned: one named person reviews it, usually the procedure owner
- Two or three outcomes: still correct (record it), new version, or retire
- Recorded: date, reviewer, outcome, what was checked and the next review date
- Separate from change control, which handles changes someone asks for
Example
A no-change review at a food plant
A delivery truck walk-around inspection SOP is on a 3-month review cycle. Two weeks before the due date, the owner walks the inspection with a driver and confirms all 8 steps still match. The owner records the review with the note "Checked against this week's walk-arounds" and sends it to the QA lead, who approves it. The SOP keeps its version number, and the next review date moves three months ahead.
Comparison
Periodic review vs change control
| Aspect | Periodic review | Change control |
|---|---|---|
| Trigger | A date on the calendar | A request: new equipment, supplier or corrective action |
| Catches | Changes nobody asked for, like drift and stale photos | Changes someone planned |
| Usual result | Often "no changes needed", recorded | A new version |
| Record | Last reviewed and next review date | Change request, approval and new version |
How SOPX handles this
SOPX keeps the review date, the reminder and the record on the procedure. Admins set Review every (3, 6, 12 or 24 months) for the organization or per procedure. The owner is reminded before the review is due, confirms that nothing changed or sends that to an approver, or starts a new version. Last reviewed and Next review show on the procedure, in its history and on exported covers.
Related use case: Quality & Compliance →Frequently asked questions
What is a periodic review of an SOP?
How often should a periodic review happen?
Does a periodic review always create a new version?
Sources
Statements above draw on the references below. Numbers in the text link to the matching entry.
- [1] EudraLex Volume 4, Chapter 4: DocumentationEuropean Commission · Accessed 2026-11-19
- [2] 9 CFR 417.4 Validation, verification, reassessmenteCFR · Accessed 2026-11-19
- [3] SOP Management Example (Tool 1.3, Good practices guidance handbook for national TB surveys)WHO TDR · Accessed 2026-11-19